Use this sales-to-delivery handover checklist to give project teams the scope, budget, assumptions and client context they need before kickoff.
Hourglass Editorial Team
Hourglass · 16 September 2026
Many project overruns begin before kickoff. The proposal describes one thing, the delivery team assumes another, and a client remembers an informal promise that never reached the project plan. A good handover gives the people doing the work the commercial and practical context they need to deliver what was sold. It does not need to be a long meeting. It needs one accountable owner and a short set of answers.
Before the kickoff, the salesperson or account lead should walk the delivery lead through the following.
Outcome and deliverables: what will the client receive, and what does acceptance mean?
Scope boundaries: what is included, excluded or dependent on a later decision?
Fee and budget: fixed fee or time and materials, planned hours by role, and expected margin.
Assumptions: what must the client supply, approve or decide, and by when?
Dates and dependencies: milestones, external deadlines and any dates promised verbally.
Stakeholders: decision maker, day-to-day contact and people who can request changes.
Risks: unresolved technical questions, compressed timelines and work estimated with low confidence.
Billing arrangements: milestones, purchase order needs and any agreed cap.
Link to the signed scope and proposal. A verbal summary is useful, but the delivery team also needs the source of truth.
The handover is the last easy opportunity to check whether the planned people are available. If the proposal assumes a mid-level consultant but only a senior specialist has capacity, revisit the cost and margin forecast. If a key person is away during a promised milestone, fix the schedule before the client builds a plan around it.
Do not hide the budget from the project manager. The delivery lead needs to know what the fee allows, how much effort was sold and where there is contingency. That context helps them make sensible trade-offs when a request or delay appears.
Create a short list of assumptions that still need confirmation. Give each an owner and a date. For example: "Client to confirm data access by Friday" or "Technical lead to validate migration estimate before build begins." An unresolved assumption that stays invisible is often treated as a promise later.
If the delivery team finds a material gap between what was sold and what can be delivered, resolve it internally first, then give the client a clear plan. The worst outcome is starting work against two different understandings of the project.
The project should leave handover with a baseline budget, named team, initial schedule, agreed scope and a list of open decisions. The delivery lead should be able to explain both the work and the commercial limits in their own words.
After kickoff, compare planned and logged time regularly. Handover protects the starting position; ongoing budget visibility protects it as the project changes.
Hourglass combines project delivery tracking, team planning and profitability reporting in one place, so the budget and assumptions agreed at handover stay visible through the ongoing weekly review rather than living only in the original proposal document.
The person who sold or scoped the work should explain the commitments. The delivery lead should confirm they understand them and take ownership of the delivery plan.
After the commercial agreement is clear and before client kickoff or resource commitments become hard to change.
Reforecast immediately, document the gap and choose a delivery or client conversation before work begins. An early correction is usually easier than explaining an overrun later.
One accountable owner, a short set of answers on scope, budget and assumptions, and a written record — so the delivery team starts from the same understanding the client was sold.
Project profitability, utilisation tracking, resource planning — all in one platform built for UK professional services firms.
Get started freeNo credit card required · Setup in minutes